Week 24 - Windows and plastering

We are once again in a period of rapid change.  since the last update the oak windows and cills have been installed, the plasters have all but completed the top floor with skim, the internal door frames have been fitted and the first of the aluminium windows have arrived.  The majority of the drainage is complete and we have started the reduced dig to take the biomass boiler slab.

Tom Dunnett mixing up before skimming

Windows from Terry Martin Joinery installed - ready for the cills

The trusty Polish Builder car to the rescue - Stirling board celotex sandwich on top



Jack putting in the fowl drains

Gary tidying up the window cills

bi-fold doors from Aspect Windows - one step closer to being water tight
The view across the yard from the hall - still looking like a building site


Mike Greerson adding the pipe bedding before backfill

Reduced dig in the long barn for the boiler room

Guest bedroom plaster boarded out ready for skimming

Our bedroom nearly ready for skimming

And the en-suite

Family bedrooms ready for boarding and sound proofing

Thursday, 3 July 2014

Week 21- further work inside and out



Hello all,

Almost a month since our last post; where has the time gone?! Since the last post a lot of work has taken place inside the Mill as well as some works outside. We now have a water supply thanks to the installation of a borehole and the first lot of bespoke windows have arrived, but most importantly we can now go up and down between the floors via the temporary stairs which have been put in as the landings are now complete....exciting!

Graham the builder with the plasterboard
pipe work for heating, water etc 
pipe work goes in along the kitchen floor
plasterboard ready to go up in our bedroom
the borehole going in 
starting the drilling for the borehole
Electrician Henry Pring in the kitchen
the sewage treatment plant going in!



the digger starting work on the drainage at the back of the barns



the poop plant arriving- thanks WCI Ltd
Temporary stairs until the proper ones arrive!

                                        View up the stairs from hallway 

post sandblasting in the kitchen to clean the stone
7 bespoke windows for the gable end in the workshop
studwork in the kitchen finally completed and ready for insulation

Aquaboard going up in one of the bathrooms!