Since out last update the project has begun to resemble a home. We have a roof on, the felting and battening is complete, half the roof lights have been installed and the slate is going on.
Battening complete |
JCB to rescue lifting slate onto the scaffolding |
Roof lights being installed |
Half of one side complete |
Tapco Slate |
The slate we are using is an imitation slate made with slate dust and a composite plastic. The benefits include the weight and speed of fixing as well as zero breakage during installation.
Internally we have been able to crack on with the structural studwork to begin constructing the floors. The most exciting part of the internal work has been the construction of the fireplace in the sitting room.
Studwork in the kitchen |
Fire place being constructed |
Fire place nearly complete |
Adrian and Steve constructing the fire place |
Final stages |
Bedroom floor joists |
We have the floor in the bedroom and floor joists in to support the bedroom above the sitting room are almost complete.
The kitchen beginning to look little more like a room |
Raking out and pointing |