Wednesday, 28 May 2014

Week 17 - Roof Complete



Since the last post the project has come on leaps and bounds.  The roof is complete including the roof lantern above the stairwell.  Mark Bucknell from MJ roofing has done an awesome job and comes with our highest recommendation.
All the slate complete
From the field side

The roof lantern
Gary, Graham and Danny have put all the floors in, which has allowed for the internal studwork to be constructed.  We can now walk around the building and begin to imagine the spaces in more detail.

The stonemasons have been completing the last of the repairs to the existing structure, which has involved numerous helibars being inserted to stitch the walls back together. We have reinstated the windows in the front and back of the long barn which had previously been blocked up.  Steve has reused some of the vousoirs to create new arches which look great.

Pete and Barney have cracked on with pointing on the gable end overlooking the canal and are making good progress with getting this end water tight.

The plumbers from Simon Kittow have also arrived on site and have fitted the first fix for the bathrooms in the Mill.  We have also moved the bath up into our bathroom in order to get it's position exactly right before the pipework is installed.
In goes the bath
Add caption
The Farm looking great!!
We have spent our spare weekends insulating the walls with celotex.  This is easily the most horrible job on site and the builders were happy for us to crack on.  We were glad to get most of it finished over the bank holiday - just the roof to do now!!
Kitchen insulation complete
Spare bedroom and bathroom (incl first fix plumbing)




Top floor bedrooms and bathroom
Our bedroom and bathroom

The next few weeks will be pretty quiet as we enter the holiday season - not for us unfortunately!!

The next jobs will be to OSB board over the celotex to create the service void for the electrician Henry Pring to come in and install the first fix.

After that it we will be ready to plaster board which will release the plasterers before we get cracking with the underfloor heating.

The replacement windows have been ordered from Terry Martin Joinery, as soon as they are installed we will be able to wave goodbye to the scaffolding.

We will try and update more regularly!!

Cheers!!

Outside

Pumba - chillin'








Monday, 5 May 2014

Week 14



Since out last update the project has begun to resemble a home.  We have a roof on, the felting and battening is complete, half the roof lights have been installed and the slate is going on.

Battening complete

JCB to rescue lifting slate onto the scaffolding
Roof lights being installed
Half of one side complete
Tapco Slate

The slate we are using is an imitation slate made with slate dust and a composite plastic.  The benefits include the weight and speed of fixing as well as zero breakage during installation.

Internally we have been able to crack on with the structural studwork to begin constructing the floors.    The most exciting part of the internal work has been the construction of the fireplace in the sitting room.
Studwork in the kitchen

Fire place being constructed
Fire place nearly complete
Adrian and Steve constructing the fire place
Final stages
Externally there are a few remaining structural repairs which need to completed; repairs to vousoirs above a couple of windows, areas of stitching and the never ending raking out and re-pointing.

Bedroom floor joists

We have the floor in the bedroom and floor joists in to support the bedroom above the sitting room are almost complete.
The kitchen beginning to look little more like a room
The final survey for the windows has been completed and the central roof light should arrive in the next week or two.

Raking out and pointing
It was also great to see some friends on Easter Saturday, thank you to everyone who popped in to say hi.